Customization: | Available |
---|---|
Casting Method: | Thermal Gravity Casting |
Process: | Lost Wax Casting |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Material / Type
|
Aluminum
|
1024,2011,6060,6063,6061,6082,7075.etc.
|
||
Brass
|
H62,H65,H68,H70,H75,H80,H85,H90,H96,HA177-2,HA177-2A,HMn58-2,HPb59-1,HSn62-1,HSi80-3,HAl60-1-1,HNi65-5,HMg60-1.etc.
|
|||
Bronze
|
ZCuSn6Zn6Pb3,ZCuSn10Pb5,ZCuSn5Zn5Pb5,C93200,Pb15Sn7,Pb20Sn5,Pb10Sn10,ZCuAl10Fe3,ZCuAl10Fe3Mn2,ZCuAl9Fe4Ni4Mn2.etc.
|
|||
Copper
|
T1,T2,T3,TU1,TU2
|
|||
Stainless Steel
|
201,202,301,304,309s,310s,410,420,431.etc.
|
|||
Carbon Steel
|
Q195,Q215,Q235,Q255,Q275,20#,45#.etc.
|
|||
Iron
|
HT350,HT300,HT250 ,HT200,HT100,RuT400,QT400-17,KHT300-06,KBT350-04,KZR450-06,STSi15R,SQTAI15Si5.etc.
|
|||
Equipment
|
Furnace equipment,Shakeout machine,Plasma cutting machine,etc.
|
|||
Sample Time
|
1-3 weeks for samples, 4-7 weeks for mass production
|
|||
Surface Treatment
|
Anodize, Bead blasted, Silk Screen, PVD Plating, Zinc/Nickel/Chrome/Titanium Plating, Brushing, Painting, Powder Coated,Passivation, Electrophoresis, Electro Polishing, Knurl, Laser/Etch/Engrave, etc.
|
|||
Tolerance
|
±0.01mm
|
|||
Service Project
|
To provide production design, production and technical service,mould development and processing, etc
|
|||
Technical Support
|
We are professional at independent development and design. Our engineers have good command of AUTO CAD, PRO ENGINEER, SOLID WORKS.etc,who can design, develop,produce and deliver your PO according to your drawings, samples or just an idea.
|
|||
Quality Control
|
Inspection 100% QC quality inspection before delivery including Incoming quality control (IQC), In process quality control(IPQC),Final quality control(FQC),Outgoing quality control(OQC)
|
We can supply any kinds of casting products according to your drawings or sample. High-quality, competitive price, also we accept smaller order.
Q1: What's the lead time?
A1: In general, the lead time is about 30~40 days for opening new moulds and mass production.