Customization: | Available |
---|---|
Casting Method: | Sand Casting |
Casting Form Material: | Sand |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Material | Aluminum alloy ADC12, ADC10, A360, A380, A356 |
Stainless Steel, Iron | |
Zinc alloy ZA3#,ZA5#,ZA8# | |
Mould lead time | 10-20days |
Mould life | 80000-100000 shots |
MOQ | 1pcs,accept sample order |
Service | OEM/CDM |
Certificate & checkout equipment | SGS,ISO9001-2015, CMM |
Processing equipments | casting machine, CNC machining center,drilling and milling machine,etc. |
Surface Treatment | galvanization,anodized,oil injection,poweder spraying,painting,etc. |
Manufacture processes | Drawings→ mould making → casting →rough machining or finish machining→surface treatment →product checking→ packing →delivery |
Sand casting parts:
Investment casting parts:
Die casting&gravity casting parts:
Forged parts
Main technics
Surface treatment
*A "bespoke" service to make castings and forgings to customers specific requirements with drawings, samples
Q1: What's the lead time?
A1: In general, the lead time is about 30~40 days for opening new moulds and mass production.